Geolocation is not supported by this browser.
0%
Linked in
Back to services

3DEXPERIENCE Turnkey implementation

3DEXPERIENCE Turnkey implementation

With the growing demand for PLM systems, Processia has developed an affordable program enabling businesses to quickly stand-up and roll-out their 3DEXPERIENCE PLM platform with limited risk and in a scalable fashion. The Processia rapid start program is powered by a series of best-practices and pre-build templates covering all the key implementation topics such as infrastructure sizing, installation, configuration, roll-out, user support and evolution roadmap definition.

Contact our nearest offices around the world Contact our office in
Contact our nearest offices

Highlights

Optimal infrastructure

  • Cost-efficient, scalable, performant and high-availability infrastructure based on customer needs and 3DEXPERIENCE requirements and performance enablement specs.
  • Optional fully managed cloud hosted infrastructure with guaranteed SLA uptimes

Maximized adoption

  • Transparent communication and adoption plan
  • KPIs for success trend monitoring and mitigation
  • High Return on Investment Roadmap proposal for platform scaling

Leading edge capabilities

  • Enablement of the latest application features through best practices roll-out
  • Fully aligned with Dassault Systèmes roadmap

Risk averse

  • Requirements mapping and gap identification activities. Gap mitigation through configuration overlay
  • Conference Room Pilot and UAT solution validation prior to roll-out
  • On-Site roll-out and user support

Methodology

Environment Set-up

Set up a cost-efficient, reliable and performant infrastructure required to support project environments.

  • Kick-off meeting
  • Acquire information: infrastructure questionnaire and workshop
  • Infrastructure hosting strategy (on-premise or specific cloud solution)
  • Infrastructure sizing, specifications and costing
  • Commission infra
  • Installation of out-of-the-box 3DEXPERIENCE Components with documentation
  • integration to client network and authentication protocol

Platform Configuration

Configure the platform key features to minimize gaps with client requirements

  • Deliver or attend training program with customer and capture any outstanding customer gaps
  • Deliver functional use-case registry with mitigated gaps through configuration or roadmap items
  • Walkthrough use-case registry and gap mitigation and refine based on feedback
  • Workshop for walkthrough of the out-of-the-box configurations and select the client expected behavior: results into design document
  • Configuration of the platform based on the design document
  • Conference Room Pilot: workshop for walkthrough of the use-cases demonstrating the configured behavior
  • UAT: users hands-on testing of the functional scope and configured behavior

Roll-out & Optimize

Roll out the platform to end-user and provide adequate support to maximize adoption and to proposed accurate roadmap.

  • Roll out /Back plan definition
  • Dry run and smoke testing
  • Roll out event
  • On-site support & configuration adjustments
  • Roadmap definition

Expertise

Project management
Project management
The project manager ensures the successful planning and the flawless execution to deliver on time and within budget.
Solution Architecture
Solution Architecture
The solution architect is responsible for analyzing and translating business information and technical requirements into the architecture and design of the solution.
Functional Consulting
Functional Consulting
The functional consultant documents the use cases, functional specifications, test plans and scenarios, and supports the customer’s end-users throughout the project implementation and deployment.
Software Development
Software Development
The software developer is involved in the definition, design, implementation, documentation, integration, testing, and support of reliable and reusable software solutions, addressing functional and business requirements alike.
Infrastructure Architecture
Infrastructure Architecture
The infrastructure architect investigates and analyzes the feasibility of the system requirements, develops the targeted system specifications and is responsible for defining the right infrastructure to secure the deployment of the business solution implementation.
Systems Administration
Systems Administration
The system administrator performs the installation, administration and configuration of the required operating system, network servers and PLM related software for the realization of customer projects.
Software Architecture
Software Architecture
The software architect defines the software architecture enabling the successful implementation of the solution, such that it suits the business requirements and achieves the desired results under given constraints.

Contact Form

×